NPV, IRR, payback: how to compute them, and above all what they do not tell you.
An internal rate of return is a single formula. What is less well mastered is the choice of discount rate, the treatment of residual value, and what the payback period conceals when used on its own.
The workshop works on cases built to expose those traps, rather than on examples that come out neatly.
The audience for this half-day is not only the person building a project: it is also the person who has to choose between several, or explain to a committee why the money goes to one rather than another. The three indicators do not answer the same question, and that is the first thing the workshop separates — a project can show a short payback and still destroy value, while another clears the bar only because of the residual value assumption that was chosen.
The calculation workbook used during the session leaves with you, the cases already built into it: you can replay a calculation afterwards and see what a single assumption changes. What we do not do is plug it into your figures. Applying the method to your project means discussing your assumptions one by one, which is advisory work. The distinction is not administrative: in a workshop, nobody around the table has read your accounts.
What you receive
- Half a day in a small group, on worked cases.
- The calculation workbook used during the workshop, to take away.
- A written handout with the formulas and their limits.
Included
- A written answer to questions raised, within 15 days of the session
Not included
- Applying it to your company's figures, which is advisory work
- Any certificate recognised by an accrediting body
Frequently asked questions
Do I need a finance background?
No. Comfort with a spreadsheet is enough. The concepts are built from the ground up.
Is the workshop certified?
No. No diploma or certificate recognised by an accrediting body is issued.
Can it be run in-house at my company?
Yes, on request, with prior scoping of the content.
How does this differ from the workshop on bankable feasibility studies?
This one is about the decision to invest: should the money be committed, and to which project. The other is about the document the bank will read and the written justification of the assumptions. Either can be taken without the other; the natural order is to settle profitability before building the file.
What does the written answer within fifteen days cover?
The questions left open at the end of the session, on the concepts and on the cases worked through. It does not cover your own figures: a question that requires looking at your project is advisory work.
Why do the cases never come out neatly?
Because a case that comes out neatly teaches only the formula. The workshop's cases are built so that the verdict flips depending on the discount rate chosen or the treatment of residual value. That is what the handout sets out as limits.