The documents to gather before commissioning a study: the list that saves three weeks

In short: A feasibility study is built from documents, not from an idea, and those documents are dictated by whoever will read the study next. The investment registration file asks for little: the Annex (I) form, the Annex (II) list of goods and services, and an identity document for a new project (Executive Decree No. 22-299, Arts. 3 and 6). The list published by BNA for an investment loan asks for some twenty, several of which carry an expiry date: a tax roll extract under three months old, a pro-forma invoice under three months old. The model terms of reference for economic land (Official Journal No. 31 of 2026, Arts. 14 to 17) ask not for documents but for information — production capacity, local integration rate, completion deadlines, jobs by contract type — each of which is evidenced by a document. This article brings the three lists together, sets out what only the sponsor holds, and proposes an order of request: first what is slow and does not perish, last what is quick but perishable.

Keywords in this article

documents to gather complete file pro-forma invoice tax roll extract CNAS and CASNOS list of goods and services evidence of site occupancy contribution in kind completion schedule document validity local integration rate technico-economic study

1. Why does the document list decide how long the study takes?

A feasibility study is not built from an idea. It is built from documents — and those documents are not chosen by the consultant. They are dictated by whoever will read the study afterwards. There are three possible readers, and no two of them ask for the same thing.

1
The Agency, for registering the investment. Executive Decree No. 22-299 of 8 September 2022 sets a short file: the Annex (I) application form and the Annex (II) list of goods and services, filed before the investment is carried out, at the one-stop desk or through the digital platform (Art. 3), with a power of attorney drawn up under Annex (III) if an agent files it. Supporting documents amount to one line for a new project — an identity document — and expand for an extension or a rehabilitation, which add copies of the commercial register extract, the tax identification number and the last closed fiscal balance sheet (Art. 6).
2
The bank, for the investment loan. The list published by BNA is of an entirely different order: some twenty documents, split into legal and administrative, then tax and social-security, then accounting and financial. It is this list that governs the timetable, because it is the most demanding of the three.
3
The terms of reference, where the project goes through economic land. The model terms of reference published in Official Journal No. 31 of 2026 do not ask for documents; they ask for information — project substance, production capacity, technological process and local integration rate (Art. 14), completion deadlines item by item (Art. 15), direct jobs split between fixed-term and open-ended contracts (Art. 16), investment structure and financing schemes (Art. 17). Each of those is evidenced by a document.

Hence the practical consequence. A field observation, not a rule of law: in the practice we observe at the firm, a study's timeline is almost never stretched by the analytical work — it is stretched by waiting for a document. Our service page states lead times "counted from receipt of a complete file". Based on our engagements, gathering the documents in the right order before the first meeting saves in the region of three weeks on a mid-sized industrial project. That is an observed order of magnitude, not a commitment.

One clarification before the list. A technico-economic study is a regulatorily required document only under Article 7 of Decree 22-299, for investments qualified as structuring according to criteria set by a separate text, Executive Decree No. 22-302, which this article does not reproduce. Everywhere else the study is required under the financier's own conditions, not under a text. Worth noting, and verified on the published list: BNA's list does not name a technico-economic study. It names an investment financing plan, forecast balance sheets covering the term of the loan, and a physical completion schedule. The study is what produces them.

2. Which legal and tax documents should be gathered first?

These are the easiest to forget, because they look administrative, and the most expensive to forget, because they block filing. The table below sets three genuinely published lists side by side: BNA's for an investment loan, BNP Paribas El Djazaïr's for a leasing file, and the investment registration file under Decree 22-299.

DocumentInvestment loan (BNA list)Leasing (BNP Paribas El Djazaïr list)Registration (Decree 22-299)
Commercial register extractin forcerequiredextension or rehabilitation only (Art. 6)
Articles of associationyes, with BOAL publicationup to date—
Minutes granting power to borrow and pledge securityyes——
Manager's identity documentyes, with CVyesyes (Art. 6)
Professional card of a foreign manager or shareholderyes——
Tax identifiersNIF and NIStax cardNIF for an extension (Art. 6)
Tax roll extractunder 3 months, cleared or with a payment scheduleunder 3 months—
CNAS and CASNOS certificatesin force, schedule if a debt existsunder 3 months—
Past financial statementslast 3 financial yearslast 2 financial yearslast closed fiscal balance sheet (Art. 6)
Main bank account statements—last 6 months—
Risk Centre searchcompleted at the branch desk——

Three readings of this table deserve emphasis.

A new company has no past financial statements. BNA's list allows for that: in place of three years, it asks for an opening balance sheet and forecast balance sheets covering the term of the loan. For a company already trading, it adds, alongside the financial statements, the statutory auditor's report for SARLs and SPAs and the certificate of filing of the annual accounts. These are documents to request, not to produce inside the study.

Tax and social-security documents are not a closing formality. An uncleared tax roll extract does not bar the file: the published list expressly allows a payment schedule instead. But the schedule itself has to be negotiated — and that delay is to be anticipated, not discovered.

Investment registration and the bank file do not feed on the same documents. The first is declarative and short; the second is evidentiary and long. In the practice we observe, a sponsor who has completed registration wrongly believes the hard part is behind him.

3. Which documents actually substantiate the investment amount?

This is the core of the file and the commonest source of back-and-forth. The investment amount is not declared; it is substantiated item by item.

  • The pro-forma invoice and/or equipment purchase contract, less than three months old. BNA's list makes it the document that justifies every item of the investment structure. Three months is short — hence the ordering rule at the end of this article.
  • The quantitative and estimated works schedule, where the project involves civil engineering.
  • An accredited expert's valuation for any contribution in kind. The same list requires it, and it also requires a prior valuation of the title deeds of assets offered as security.
  • The physical completion schedule. It maps exactly onto Article 15 of the model terms of reference, which splits deadlines between studies and building permit, site preparation, structural works, infrastructure, then equipment installation before operation.

A methodological point that only appears when the texts are compared: the same equipment is described twice, at two different levels of detail. Annex (II) to Decree 22-299 has only two columns, "Désignation" and "Quantité" — no price at all. The bank wants the price and its supporting document. An equipment list built for the Agency therefore never suffices for the bank, and the reverse holds too: that is the subject of our article on sizing the investment.

The pro-forma invoice also has a function few sponsors anticipate: Article 13 of Decree 22-299 makes use of the benefits conditional on commercial register registration and obtaining the NIF, and provides that VAT exemption authorisations are issued within 72 hours of a pro-forma invoice being presented. The pro-forma is not merely a price estimate: it is the key that opens the exemption.

A special but real case: relocating an activity from abroad. Article 8 of Decree 22-299 adds the articles of association of both companies, a technical sheet, a contribution auditor's valuation report less than six months old, and an equipment renovation certificate issued by an accredited inspection body.

Are your documents enough to open the study?

Send us what you already hold — pro-forma invoices, deeds, articles of association, tax identifiers. We return the list of what is missing, the order in which to request it, and which documents will expire before filing. Scoping is free and leads to a written quotation.

Have my documents checked

4. Which documents prove the project's site and permits?

A project without a demonstrated address is not bankable, whatever profitability has been calculated for it. BNA's list requires evidence of occupancy of the premises or activity site, in one of three forms: title deed, lease, or concession deed. And where assets are offered as security, it additionally requires their title deeds, with a valuation.

If the project goes through economic land, the site is not a document to supply: it is the subject of the application itself. The model terms of reference in Official Journal No. 31 of 2026 then frame what follows — financial conditions of a negotiated concession with an annual rent (Art. 18), payment arrangements with a fifteen-day deadline, formal notice, a 5% penalty and possible termination (Art. 19), and possession recorded by formal report (Art. 20). Those deadlines become assumptions in the study: they are not invented.

The document discovered too late. A practice observation, not a rule of law: some activities are subject to a sectoral permit, an approval or a prior classification, independent of the investment file and processed by a different administration. When that obligation is discovered at filing, it is not the study that has to be redone — the whole project calendar slips. We check this point at the scoping stage, before opening the study. The clearest example is the hotel establishment and its classification.

5. Which operating data must you supply rather than expect from the consultant?

There is a clear line between what a consultant builds and what only the project sponsor holds. Blurring it produces an unverifiable study — and that is precisely what institutional readers penalise.

Information requiredArticle of the model terms of referenceDocument or data that evidences it
Production capacity and technological processArt. 14equipment technical sheets (output, throughput) and the matching supplier quotation
Local integration rate and locally produced inputsArt. 14list of inputs, with origin and price from each local supplier
Completion deadlines, item by itemArt. 15delivery lead times stated by suppliers, and the works contractor's schedule
Direct jobs, split by contract typeArt. 16forecast organisation chart and intended pay scale
Total cost and investment structureArt. 17pro-forma invoices and estimates, item by item
Financing schemesArt. 17evidence of mobilisable contribution, and notified grant decisions

Based on our engagements, three data points come up every time and can only come from the sponsor: the selling price he intends to charge, the prices his suppliers have actually granted him, and the number of people he intends to employ. A consultant can challenge them, benchmark them and stress-test them — he cannot invent them without turning the study into an exercise in style. That is also why field verification of market assumptions is a separate step, covered in our article on market research.

6. Which documents take longest to obtain, and in what order should they be requested?

The table below is the only one in this article whose middle column comes from experience rather than from a text. The lead times shown are orders of magnitude observed at the firm, strictly illustrative — they are neither a standard nor a commitment. The validity periods, by contrast, are those of the published lists and texts.

DocumentObserved lead time (illustrative)Required validity (published source)
Articles of association, minutes of powersa few days where the company existsarticles "up to date" (BNP Paribas El Djazaïr)
Commercial register extractshort"in force" (BNA)
Tax roll extractshort to moderate, longer where a schedule must be negotiatedunder 3 months (BNA, BNP Paribas El Djazaïr)
CNAS and CASNOS certificatesmoderate"in force" (BNA) · under 3 months (BNP Paribas El Djazaïr)
Equipment pro-forma invoicesmoderate, longer on importsunder 3 months (BNA)
Valuation of a contribution in kindmoderateaccredited expert (BNA) · report under 6 months on relocation (Art. 8, Decree 22-299)
Evidence of site occupancyhighly variable by form (ownership, lease, concession)title deed, lease or concession deed (BNA)
Main account statementsshortlast 6 months (BNP Paribas El Djazaïr)

From that table follows an ordering rule that fits in one sentence, and that is itself a practice observation: request first what is slow and does not perish, and last what is quick but perishable. Articles of association, deeds and valuations do not spoil while they wait; the tax roll extract, the fund certificates and the pro-forma invoice do. A pro-forma obtained too early is a pro-forma to request again — and that is, in the practice we observe, the most banal reason for delay in an otherwise complete file.

The omissions we meet most often, in decreasing order of frequency — an experience list, not a regulatory hierarchy:

  1. The minutes granting the manager power to borrow and pledge security. They almost never exist when they are asked for, and they presuppose convening the meeting.
  2. Pro-forma invoices for secondary equipment. The main machines are priced; the ancillary equipment — which Article 17 of the terms of reference expressly distinguishes from production equipment — is not.
  3. The professional card of a foreign manager, required by BNA's published list, whose own lead time is not the file's.
  4. Supplier delivery lead times, without which the Article 15 completion schedule is fiction.
  5. The pay scale, which governs the Article 16 contract split and the whole forecast income statement.

One last, more structural observation. In our experience, a file is almost never incomplete through negligence: it is incomplete because the documents were requested in the order they came to mind, not in the order they arrive. The list is not an administrative form — it is the project's critical path.

Disclaimer. This article provides general information on the documents to gather ahead of a feasibility or technico-economic study in Algeria, as at the date shown. It is not legal, tax or investment advice, and it is not a guarantee of obtaining financing, land or a benefit. The lead times given as examples are illustrative and observed, not regulatory. Bank and agency document lists change without any amendment to the texts: check with the body concerned before any decision.

FAQ — Frequently asked questions

Sources and references

  • Décret exécutif n° 22-299 du 11 Safar 1444 correspondant au 8 septembre 2022 fixant les modalités d'enregistrement des investissements — art. 3 (dossier : annexes (I), (II) et (III)), art. 6 (pièces justificatives, création et extension), art. 7 (étude technico-économique des investissements structurants, critères du décret 22-302), art. 8 (délocalisation : statuts, fiche technique, rapport du commissaire aux apports de moins de six mois, certificat de rénovation), art. 13 (immatriculation et NIF préalables à l'usage des avantages ; franchise de TVA dans les 72 heures suivant la facture pro-forma) ; annexe (I), rubriques 1 à 9 ; annexe (II), colonnes « Désignation » et « Quantité » (JO n° 60 de 2022, p. 12-13 et 15-17) — JORADP · Verified on 2026-11-09
  • Journal officiel n° 31 du 28 avril 2026 — cahier des charges type annexé (décrets exécutifs n° 26-152 à 26-158 du 14 avril 2026) : art. 14 (description du projet, processus technologique, intégration locale), art. 15 (délais de réalisation : études et permis de construire, aménagement, gros œuvre, infrastructures, montage), art. 16 (emplois directs, CDD et CDI), art. 17 (capacités financières, structure de l'investissement, schémas de financement), art. 18 et 19 (redevance locative, délai de quinze jours, pénalité de 5 %), art. 20 (prise de possession par procès-verbal), p. 21 à 24 — JORADP · Verified on 2026-11-09
  • BNA, « Dossier de crédit d'investissement » — liste publiée des pièces : documents juridiques et administratifs (registre de commerce en cours de validité, statuts et BOAL, PV de pouvoirs d'emprunt et d'affectation des garanties, CV et pièce d'identité des dirigeants, carte professionnelle du gérant étranger, NIF et NIS, justificatif d'occupation du site — acte de propriété, bail ou acte de concession —, consultation de la Centrale des risques) ; documents fiscaux et parafiscaux (extrait de rôle de moins de trois mois apuré ou avec échéancier, attestations CNAS et CASNOS en cours de validité) ; documents comptables et financiers (états financiers des trois derniers exercices, rapport du commissaire aux comptes pour les SARL et SPA, attestation de dépôt des comptes sociaux, bilan d'ouverture et bilans prévisionnels sur la durée du prêt, plan de financement de l'investissement, facture pro-forma et/ou contrat d'achat de moins de trois mois, devis quantitatif et estimatif des travaux, expertise par un expert agréé des apports en nature, planning de réalisation physique) — BNA · Verified on 2026-11-09
  • BNP Paribas El Djazaïr, « Liste des documents à fournir » (dossier de leasing) — documents juridiques (extrait du registre de commerce, statuts à jour, carte fiscale, pièce d'identité du gérant), financiers (bilan et compte de résultat des deux derniers exercices ; extraits de rôles, CNAS et CASNOS de moins de trois mois ; relevés du compte bancaire principal des six derniers mois) et commerciaux (état des marchés en cours, état du parc, facture pro-forma de l'équipement à acquérir) — BNP Paribas El Djazaïr · Verified on 2026-11-09
BENSAID Farouk ProfitPilot

BENSAID Farouk

Financial & Economic Research Consultant — ProfitPilot NextGen Consulting

Certified sole trader and expert in financial studies, risk analysis and market research for SMEs, startups and investors in Algeria. View full profile