The documents to gather before commissioning a study: the list that saves three weeks
In short: A feasibility study is built from documents, not from an idea, and those documents are dictated by whoever will read the study next. The investment registration file asks for little: the Annex (I) form, the Annex (II) list of goods and services, and an identity document for a new project (Executive Decree No. 22-299, Arts. 3 and 6). The list published by BNA for an investment loan asks for some twenty, several of which carry an expiry date: a tax roll extract under three months old, a pro-forma invoice under three months old. The model terms of reference for economic land (Official Journal No. 31 of 2026, Arts. 14 to 17) ask not for documents but for information — production capacity, local integration rate, completion deadlines, jobs by contract type — each of which is evidenced by a document. This article brings the three lists together, sets out what only the sponsor holds, and proposes an order of request: first what is slow and does not perish, last what is quick but perishable.
Keywords in this article
1. Why does the document list decide how long the study takes?
A feasibility study is not built from an idea. It is built from documents — and those documents are not chosen by the consultant. They are dictated by whoever will read the study afterwards. There are three possible readers, and no two of them ask for the same thing.
Hence the practical consequence. A field observation, not a rule of law: in the practice we observe at the firm, a study's timeline is almost never stretched by the analytical work — it is stretched by waiting for a document. Our service page states lead times "counted from receipt of a complete file". Based on our engagements, gathering the documents in the right order before the first meeting saves in the region of three weeks on a mid-sized industrial project. That is an observed order of magnitude, not a commitment.
One clarification before the list. A technico-economic study is a regulatorily required document only under Article 7 of Decree 22-299, for investments qualified as structuring according to criteria set by a separate text, Executive Decree No. 22-302, which this article does not reproduce. Everywhere else the study is required under the financier's own conditions, not under a text. Worth noting, and verified on the published list: BNA's list does not name a technico-economic study. It names an investment financing plan, forecast balance sheets covering the term of the loan, and a physical completion schedule. The study is what produces them.
2. Which legal and tax documents should be gathered first?
These are the easiest to forget, because they look administrative, and the most expensive to forget, because they block filing. The table below sets three genuinely published lists side by side: BNA's for an investment loan, BNP Paribas El Djazaïr's for a leasing file, and the investment registration file under Decree 22-299.
| Document | Investment loan (BNA list) | Leasing (BNP Paribas El Djazaïr list) | Registration (Decree 22-299) |
|---|---|---|---|
| Commercial register extract | in force | required | extension or rehabilitation only (Art. 6) |
| Articles of association | yes, with BOAL publication | up to date | — |
| Minutes granting power to borrow and pledge security | yes | — | — |
| Manager's identity document | yes, with CV | yes | yes (Art. 6) |
| Professional card of a foreign manager or shareholder | yes | — | — |
| Tax identifiers | NIF and NIS | tax card | NIF for an extension (Art. 6) |
| Tax roll extract | under 3 months, cleared or with a payment schedule | under 3 months | — |
| CNAS and CASNOS certificates | in force, schedule if a debt exists | under 3 months | — |
| Past financial statements | last 3 financial years | last 2 financial years | last closed fiscal balance sheet (Art. 6) |
| Main bank account statements | — | last 6 months | — |
| Risk Centre search | completed at the branch desk | — | — |
Three readings of this table deserve emphasis.
A new company has no past financial statements. BNA's list allows for that: in place of three years, it asks for an opening balance sheet and forecast balance sheets covering the term of the loan. For a company already trading, it adds, alongside the financial statements, the statutory auditor's report for SARLs and SPAs and the certificate of filing of the annual accounts. These are documents to request, not to produce inside the study.
Tax and social-security documents are not a closing formality. An uncleared tax roll extract does not bar the file: the published list expressly allows a payment schedule instead. But the schedule itself has to be negotiated — and that delay is to be anticipated, not discovered.
Investment registration and the bank file do not feed on the same documents. The first is declarative and short; the second is evidentiary and long. In the practice we observe, a sponsor who has completed registration wrongly believes the hard part is behind him.
3. Which documents actually substantiate the investment amount?
This is the core of the file and the commonest source of back-and-forth. The investment amount is not declared; it is substantiated item by item.
- The pro-forma invoice and/or equipment purchase contract, less than three months old. BNA's list makes it the document that justifies every item of the investment structure. Three months is short — hence the ordering rule at the end of this article.
- The quantitative and estimated works schedule, where the project involves civil engineering.
- An accredited expert's valuation for any contribution in kind. The same list requires it, and it also requires a prior valuation of the title deeds of assets offered as security.
- The physical completion schedule. It maps exactly onto Article 15 of the model terms of reference, which splits deadlines between studies and building permit, site preparation, structural works, infrastructure, then equipment installation before operation.
A methodological point that only appears when the texts are compared: the same equipment is described twice, at two different levels of detail. Annex (II) to Decree 22-299 has only two columns, "Désignation" and "Quantité" — no price at all. The bank wants the price and its supporting document. An equipment list built for the Agency therefore never suffices for the bank, and the reverse holds too: that is the subject of our article on sizing the investment.
The pro-forma invoice also has a function few sponsors anticipate: Article 13 of Decree 22-299 makes use of the benefits conditional on commercial register registration and obtaining the NIF, and provides that VAT exemption authorisations are issued within 72 hours of a pro-forma invoice being presented. The pro-forma is not merely a price estimate: it is the key that opens the exemption.
A special but real case: relocating an activity from abroad. Article 8 of Decree 22-299 adds the articles of association of both companies, a technical sheet, a contribution auditor's valuation report less than six months old, and an equipment renovation certificate issued by an accredited inspection body.
Are your documents enough to open the study?
Send us what you already hold — pro-forma invoices, deeds, articles of association, tax identifiers. We return the list of what is missing, the order in which to request it, and which documents will expire before filing. Scoping is free and leads to a written quotation.
Have my documents checked4. Which documents prove the project's site and permits?
A project without a demonstrated address is not bankable, whatever profitability has been calculated for it. BNA's list requires evidence of occupancy of the premises or activity site, in one of three forms: title deed, lease, or concession deed. And where assets are offered as security, it additionally requires their title deeds, with a valuation.
If the project goes through economic land, the site is not a document to supply: it is the subject of the application itself. The model terms of reference in Official Journal No. 31 of 2026 then frame what follows — financial conditions of a negotiated concession with an annual rent (Art. 18), payment arrangements with a fifteen-day deadline, formal notice, a 5% penalty and possible termination (Art. 19), and possession recorded by formal report (Art. 20). Those deadlines become assumptions in the study: they are not invented.
The document discovered too late. A practice observation, not a rule of law: some activities are subject to a sectoral permit, an approval or a prior classification, independent of the investment file and processed by a different administration. When that obligation is discovered at filing, it is not the study that has to be redone — the whole project calendar slips. We check this point at the scoping stage, before opening the study. The clearest example is the hotel establishment and its classification.
5. Which operating data must you supply rather than expect from the consultant?
There is a clear line between what a consultant builds and what only the project sponsor holds. Blurring it produces an unverifiable study — and that is precisely what institutional readers penalise.
| Information required | Article of the model terms of reference | Document or data that evidences it |
|---|---|---|
| Production capacity and technological process | Art. 14 | equipment technical sheets (output, throughput) and the matching supplier quotation |
| Local integration rate and locally produced inputs | Art. 14 | list of inputs, with origin and price from each local supplier |
| Completion deadlines, item by item | Art. 15 | delivery lead times stated by suppliers, and the works contractor's schedule |
| Direct jobs, split by contract type | Art. 16 | forecast organisation chart and intended pay scale |
| Total cost and investment structure | Art. 17 | pro-forma invoices and estimates, item by item |
| Financing schemes | Art. 17 | evidence of mobilisable contribution, and notified grant decisions |
Based on our engagements, three data points come up every time and can only come from the sponsor: the selling price he intends to charge, the prices his suppliers have actually granted him, and the number of people he intends to employ. A consultant can challenge them, benchmark them and stress-test them — he cannot invent them without turning the study into an exercise in style. That is also why field verification of market assumptions is a separate step, covered in our article on market research.
6. Which documents take longest to obtain, and in what order should they be requested?
The table below is the only one in this article whose middle column comes from experience rather than from a text. The lead times shown are orders of magnitude observed at the firm, strictly illustrative — they are neither a standard nor a commitment. The validity periods, by contrast, are those of the published lists and texts.
| Document | Observed lead time (illustrative) | Required validity (published source) |
|---|---|---|
| Articles of association, minutes of powers | a few days where the company exists | articles "up to date" (BNP Paribas El Djazaïr) |
| Commercial register extract | short | "in force" (BNA) |
| Tax roll extract | short to moderate, longer where a schedule must be negotiated | under 3 months (BNA, BNP Paribas El Djazaïr) |
| CNAS and CASNOS certificates | moderate | "in force" (BNA) · under 3 months (BNP Paribas El Djazaïr) |
| Equipment pro-forma invoices | moderate, longer on imports | under 3 months (BNA) |
| Valuation of a contribution in kind | moderate | accredited expert (BNA) · report under 6 months on relocation (Art. 8, Decree 22-299) |
| Evidence of site occupancy | highly variable by form (ownership, lease, concession) | title deed, lease or concession deed (BNA) |
| Main account statements | short | last 6 months (BNP Paribas El Djazaïr) |
From that table follows an ordering rule that fits in one sentence, and that is itself a practice observation: request first what is slow and does not perish, and last what is quick but perishable. Articles of association, deeds and valuations do not spoil while they wait; the tax roll extract, the fund certificates and the pro-forma invoice do. A pro-forma obtained too early is a pro-forma to request again — and that is, in the practice we observe, the most banal reason for delay in an otherwise complete file.
The omissions we meet most often, in decreasing order of frequency — an experience list, not a regulatory hierarchy:
- The minutes granting the manager power to borrow and pledge security. They almost never exist when they are asked for, and they presuppose convening the meeting.
- Pro-forma invoices for secondary equipment. The main machines are priced; the ancillary equipment — which Article 17 of the terms of reference expressly distinguishes from production equipment — is not.
- The professional card of a foreign manager, required by BNA's published list, whose own lead time is not the file's.
- Supplier delivery lead times, without which the Article 15 completion schedule is fiction.
- The pay scale, which governs the Article 16 contract split and the whole forecast income statement.
One last, more structural observation. In our experience, a file is almost never incomplete through negligence: it is incomplete because the documents were requested in the order they came to mind, not in the order they arrive. The list is not an administrative form — it is the project's critical path.
Disclaimer. This article provides general information on the documents to gather ahead of a feasibility or technico-economic study in Algeria, as at the date shown. It is not legal, tax or investment advice, and it is not a guarantee of obtaining financing, land or a benefit. The lead times given as examples are illustrative and observed, not regulatory. Bank and agency document lists change without any amendment to the texts: check with the body concerned before any decision.
FAQ — Frequently asked questions
Not to register the investment for a new project: Article 6 of Executive Decree No. 22-299 requires only an identity document, and the commercial register extract is required only for an extension or a rehabilitation. But Article 13 of the same decree makes use of the benefits conditional on commercial register registration and obtaining the NIF, and BNA's published list requires an extract in force. The study can therefore start before; the financing and the benefits cannot.
BNA's published list accepts a pro-forma invoice and/or an equipment purchase contract, in both cases less than three months old, to justify every item of the investment structure. It adds a quantitative and estimated works schedule where the project involves civil engineering. The pro-forma also has a function of its own: Article 13 of Decree 22-299 provides that VAT exemption authorisations are issued within 72 hours of its presentation.
Yes, and it often does. BNA's published list accepts three forms of occupancy evidence: title deed, lease or concession deed. And where the project goes through economic land, the site is not a document to supply but the subject of the application — the technico-economic study is part of what makes obtaining it possible. In the practice we observe, the study is run on a documented site assumption and then adjusted to the actual deed.
No. Article 7 of Executive Decree No. 22-299 requires one only for investments qualified as structuring, under criteria set by Executive Decree No. 22-302. Elsewhere it is required under the financier's own conditions or under the land file: BNA's published list, for instance, does not name it, yet it calls for a financing plan, forecast balance sheets over the term of the loan and a physical completion schedule — that is, its outputs.
It depends on the document, and that is what dictates the order of requests. Per the published lists: tax roll extract under three months old, CNAS and CASNOS certificates in force (under three months in BNP Paribas El Djazaïr's list), pro-forma invoice or purchase contract under three months old, main account statements for the last six months, commercial register extract in force. Where an activity is relocated from abroad, Article 8 of Decree 22-299 adds a contribution auditor's valuation report less than six months old.
A field observation, not a rule of law: the file is not rejected, it is put on hold — which is worse, because the perishable documents keep ageing in the meantime. That is why we settle the complete list before opening the study rather than along the way.
Sources and references
- Décret exécutif n° 22-299 du 11 Safar 1444 correspondant au 8 septembre 2022 fixant les modalités d'enregistrement des investissements — art. 3 (dossier : annexes (I), (II) et (III)), art. 6 (pièces justificatives, création et extension), art. 7 (étude technico-économique des investissements structurants, critères du décret 22-302), art. 8 (délocalisation : statuts, fiche technique, rapport du commissaire aux apports de moins de six mois, certificat de rénovation), art. 13 (immatriculation et NIF préalables à l'usage des avantages ; franchise de TVA dans les 72 heures suivant la facture pro-forma) ; annexe (I), rubriques 1 à 9 ; annexe (II), colonnes « Désignation » et « Quantité » (JO n° 60 de 2022, p. 12-13 et 15-17) — JORADP · Verified on 2026-11-09
- Journal officiel n° 31 du 28 avril 2026 — cahier des charges type annexé (décrets exécutifs n° 26-152 à 26-158 du 14 avril 2026) : art. 14 (description du projet, processus technologique, intégration locale), art. 15 (délais de réalisation : études et permis de construire, aménagement, gros œuvre, infrastructures, montage), art. 16 (emplois directs, CDD et CDI), art. 17 (capacités financières, structure de l'investissement, schémas de financement), art. 18 et 19 (redevance locative, délai de quinze jours, pénalité de 5 %), art. 20 (prise de possession par procès-verbal), p. 21 à 24 — JORADP · Verified on 2026-11-09
- BNA, « Dossier de crédit d'investissement » — liste publiée des pièces : documents juridiques et administratifs (registre de commerce en cours de validité, statuts et BOAL, PV de pouvoirs d'emprunt et d'affectation des garanties, CV et pièce d'identité des dirigeants, carte professionnelle du gérant étranger, NIF et NIS, justificatif d'occupation du site — acte de propriété, bail ou acte de concession —, consultation de la Centrale des risques) ; documents fiscaux et parafiscaux (extrait de rôle de moins de trois mois apuré ou avec échéancier, attestations CNAS et CASNOS en cours de validité) ; documents comptables et financiers (états financiers des trois derniers exercices, rapport du commissaire aux comptes pour les SARL et SPA, attestation de dépôt des comptes sociaux, bilan d'ouverture et bilans prévisionnels sur la durée du prêt, plan de financement de l'investissement, facture pro-forma et/ou contrat d'achat de moins de trois mois, devis quantitatif et estimatif des travaux, expertise par un expert agréé des apports en nature, planning de réalisation physique) — BNA · Verified on 2026-11-09
- BNP Paribas El Djazaïr, « Liste des documents à fournir » (dossier de leasing) — documents juridiques (extrait du registre de commerce, statuts à jour, carte fiscale, pièce d'identité du gérant), financiers (bilan et compte de résultat des deux derniers exercices ; extraits de rôles, CNAS et CASNOS de moins de trois mois ; relevés du compte bancaire principal des six derniers mois) et commerciaux (état des marchés en cours, état du parc, facture pro-forma de l'équipement à acquérir) — BNP Paribas El Djazaïr · Verified on 2026-11-09